TRIO-27.6-TL-OUTD
ABB Aurora Power-One TRIO-27.6-TL string inverter
BVS Electronics: Certified Quality

Repairs in accordance with Machinery Directive 2006/42/EC
You benefit from:
- BVS REPAIR / PRODUCT OVERHAUL • Comprehensive product-repair overhauls • Repairs and replacements for discontinued assemblies • Preventive replacement of all components identified as weak points or wear parts • Optional expedited repairs • Preventive overhaul packages (ECOFIT) • Cleaning and washing of each assembly before repair • Functional and stress tests • Use of components approved by the manufacturer/legislator
- BVS SERVICE • 24/7 hotline • Long-term supply analyses and concepts • Very attractive price levels • Free shipping up to 30 kg • Free technical hotline • On-site service and configuration
- BVS AVAILABILITY • Over 1,000,000 assemblies available 24/7 • 24/7 courier service • Multiple shipping options • Own HMI / IPC • Express air freight
- BVS QUALITY • 24 months warranty* • Extensive technical expertise and state-of-the-art diagnostic systems • Comprehensive documentation">All advantages in the tooltip when you hover your mouse over here.
Your BVS Electronics Advantages
No longer needed assemblies? We turn them into cash!
We purchase across manufacturers – whether defective or fully functional. Fast, straightforward, and at fair prices.
Request a quote now!
📞 Phone: +49 6181 95404-207
✉️ Email: ankauf@bvs-electronics.com
The three-phase commercial inverter offers more flexibility and control to installers who have large installations with varying aspects or orientations.
The dual input section containing two independent Maximum Power Point Tracking (MPPT), allows optimal energy harvesting from two sub-arrays oriented in different directions.
The TRIO features a high speed and precise MPPT algorithm for real power tracking and improved energy harvesting.
NOTE: If installing a PV system using TRIO in North America, please verify that the selected PV module is listed for use in 1000Vdc systems in accordance with local electrical codes.
Highlights
• True three-phase bridge topology for DC/AC output converter
• Transformerless topology
• Each inverter is set on specific grid codes which can be selected in the field
• Detachable wiring box to allow an easy installation
• Wide input range
• ‘Electrolyte-free’ power converter to further increase the life expectancy
| Product Data AC Connection | Screw terminals, cable entry PG36 |
|---|---|
| Product Data DC Connection | PV connector / screw terminal block for the Standard and -S2 versions |
| Product Data Euro efficiency in % | 98 |
| Product Data Display | Graphic display |
| Product Data Transformer | no |
| Product Data Height (mm) | 1061 |
| Product Data Interfaces | wired: PVI-USB-RS232_485 (opt.) wireless: VSN300 Wifi Logger Card (opt.) |
| Product Data Length (mm) | 292 |
| Product Data Maximum input current (A) | 64 |
| Product Data Nominal AC power (W) | 27600 |
| Product Data Amount MPP Tracker | 2 |
| Product Data Amount phases | 3 |
| Product Data Protection class (EU) | IP 65 |
| Product Data DC voltage range (V) from | 500 |
| Product Data DC voltage range (V) until | 800 |
| Product Data Weight (kg net) | 75 |
| Product Data Width (mm) | 702 |
| Product Data C ° working temperature range from | -25 |
| Product Data C ° working temperature range until | 60 |

* 24-month warranty on new parts, product-overhauling repairs and product-overhauled spare and replacement parts. We not only carry out our preventive measures for product-overhauling repairs, exchange and spare parts sales, but also extensively test each electronic assembly for function and load. In addition, we use original and safety-compliant components and thus guarantee the safety of the modules used in accordance with the standards of the Machinery Directive 2006/42 / EC.
** There is no guarantee for our "Cleaning & Inspection" service type.
Reliable inverters are worth their weight in gold!
Discover how much money you're losing due to downtime – with our inverter loss calculator.
Inverter failure doesn't just mean technical problems – it means cash slipping through your fingers. These losses can be substantial and depend on many factors: your feed-in tariff, the capacity of your inverter, and the valuable production hours you lose during downtime.
